Due to the extremely challenging logistics of this hotel redevelopment project in Downtown Aspen, Colorado, the Contractor brought in PCI to install all windows and doors, weather barrier, exterior insulation, and wood siding.
PCI’s team took a Design Assist approach to their scope of work, and collaborated with the Design Team to develop exterior details that met the design intent while maintaining all Manufacturers’ warranties.
21,000 SF of Montana Timber Products siding
51,000 SF of Tyvek Building Wrap
James Hardie Reveal Panel siding at rooftop bar
No content
A problem occurred while loading content.